Huabang Power Technology Co., Ltd.

National Unified Hotline: 400-0577-818

EN

Jiangxi Province State Organ Office Buildings and Large Public Buildings Energy Consumption Monitoring System Public Institution Platform

Project Location: Nanchang, Jiangxi

Delivery Time: 2017-01

Project Name

  • Jiangxi Province State Organ Office Buildings and Large Public Buildings Energy Consumption Monitoring System Public Institution Platform


Project Description

  • Three-phase multi-function power meter


Jiangxi Province State Organ Office Buildings and Large Public Buildings Energy Consumption Monitoring System Public Institution Platform

Project plan: 

image

Other Cases

Yunnan Water Conservancy and Electric Power Co., Ltd
Municipal Engineering

Yunnan Water Conservancy and Electric Power Co., Ltd

Yunnan Water Conservancy and Hydropower Engineering Co., Ltd., founded in 1960, is a first-class qualification for general contracting of water conservancy and hydropower...

View More >
The demolition project of the Yinzhou District Prevention and Control Office Surprise Command and Training Center
Municipal Engineering

The demolition project of the Yinzhou District Prevention and Control Office Surprise Command and Training Center

Three-phase multi-function power meter PD668E-9S4 single three-phase rail with 485 meter MODBUS protocol

View More >
Zhoushan Dinghai 91991 Unit Prepaid Meter Material Procurement Project
Hotline

400-0577-818

Consultation Hotline
二维码

Mobile Site

Copyright © 2025 Huabang Power Technology Co., Ltd. All rights reserved.

ICP: 浙ICP备09083223号-8

Powered by: wzzw.com