Huabang Power Technology Co., Ltd.

National Unified Hotline: 400-0577-818

EN

Jilin Yanbian Mining Bureau - Mine use table

Project Location: Yanbian, Jilin

Delivery Time: 2012-09

Project Name

  • Jilin Yanbian Mining Bureau - Mine use table


Project Description

  • Jilin Yanbian Mining Bureau, whose office is located in Yanbian, the largest concentration of Koreans in China, is mainly engaged in coal production and mine construction.


  • The project uses a three-phase multi-function energy meter, which can measure forward and reverse active and reactive energy, and measure the maximum demand of active, reactive and each rate. It has 4 rates, 10 time periods, 4 time zones, and 5 daily time periods, which can realize various event recording and load curve recording such as loss of voltage, current loss, demand clearance, programming, etc., and has functions such as power pulse output and clock signal output. Its product performance indicators comply with the technical requirements of GB/T17215.321-2008 "Level 1 and 2 Static AC Active Energy Meters", GB/T17215.323-2008 "Level 2 and 3 Static AC Reactive Power Meters" and GB/T17215.301-2007 "Multi-functional Energy Meters" standards. The communication protocol conforms to DL/T645-1997 "Communication Protocol for Multifunctional Energy Meters" and special regulations required by users.


Jilin Yanbian Mining Bureau - Mine use table

Other Cases

Energy consumption monitoring system of Qingdao Jimo Blue Economic Development Zone
Industrial & Mining

Energy consumption monitoring system of Qingdao Jimo Blue Economic Development Zone

Shandong Qingdao Jimo Provincial Economic Development Zone Blue New Area Project Stage: Decoration and subcontracting project cost: 150 million yuan Construction area: 70...

View More >
Zhuji Huanjiang Commercial Management Co., Ltd
Industrial & Mining

Zhuji Huanjiang Commercial Management Co., Ltd

The project selects a single-phase prepaid rail meter, which can realize the setting or monitoring of various information such as the user's pre-purchased electricity...

View More >
Shenzhen is good for the electricity management system of industrial zones
Industrial & Mining

Shenzhen is good for the electricity management system of industrial zones

The project selects prepaid energy meters, which can realize the setting or monitoring of various information such as the user's pre-purchased electricity, preset max...

View More >
Hotline

400-0577-818

Consultation Hotline
二维码

Mobile Site

Copyright © 2025 Huabang Power Technology Co., Ltd. All rights reserved.

ICP: 浙ICP备09083223号-8

Powered by: wzzw.com